Robot Technology News  
Trench On Mars Ready For Next Sampling By NASA Lander

This view from the Surface Stereo Imager on NASA's Phoenix Mars Lander shows the trench informally named "Snow White." This image was taken after a series of scrapings by the lander's Robotic Arm on the 58th Martian day, or sol, of the mission (July 23, 2008). The scrapings were done in preparation for collecting a sample for analysis from a hard subsurface layer where soil may contain frozen water. The trench is 4 to 5 centimeters (about 2 inches) deep and about 23 centimeters (9 inches) wide. The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver. Image credit: NASA/JPL-Caltech/University of Arizona/Texas A and M University
by Staff Writers
Tucson AZ (SPX) Jul 25, 2008
NASA's Phoenix Mars Lander has groomed the bottom of a shallow trench to prepare for collecting a sample to be analyzed from a hard subsurface layer where the soil may contain frozen water.

Images received Thursday morning confirmed that the lander's robotic arm had scraped the top of the hard layer clean during activities of Phoenix's 58th Martian day, or sol, corresponding to overnight Wednesday to Thursday.

The Phoenix team developed commands for sending to the spacecraft Thursday to complete two remaining preparations necessary before collecting a sample and delivering it to the lander's Thermal and Evolved-Gas Analyzer (TEGA).

One part of the plan for Sol 59 (overnight Thursday to Friday) would assure that the scoop is empty of any soil collected earlier. Another would complete a final cleaning of any volatile materials from the oven that will receive the sample.

In the past two weeks, the team has refined techniques for using a powered rasp on the back of the arm's scoop to cut and collect shavings of material from the bottom of the trench. The trench, informally named "Snow White," is 4 to 5 centimeters deep (about 2 inches), about 23 centimeters wide (9 inches), and about 60 centimeters long (24 inches) long.

"The rasped material ends up in the back of the scoop, and we have to transfer it to the front through a pathway. That takes a series of arm moves to be sure the material gets through the pathway," said Robert Bonitz of NASA's Jet Propulsion Laboratory, Pasadena, Calif., manager for the robotic arm.

"The reason we're doing it today is we want to be sure the pathway is free of any material collected previously before we collect the next sample for delivery to TEGA."

The planned activity would repeat the series of pathway-clearing moves twice, and check visually to be sure the front of the scoop is empty. It is also important to get the background counts as low as possible in TEGA's evolved-gas analyzer, which receives vapors emitted from the oven.

The instrument was heated repeatedly before launch and during the flight to Mars to drive off any volatile material in it, such as water and carbon-dioxide gases that tend to stick on surfaces. It got another heating on Sol 58.

"The baking last night was to remove background volatiles stuck on the walls of the instrument," said William Boynton of the University of Arizona, Tucson, lead scientist for TEGA. "What we're planning today is pumping out any gas we might have released with the baking."

Other activities in the plan for the sol beginning today include weather monitoring and photography of several areas. Some planned use of the Surface Stereo Imager would record the same view consecutively through 15 different filters.

Each filter lets through only a limited band of wavelengths of visible or infrared light. Using just red, green and blue filters allows the team to make full-color images. Using the additional filters provides more information useful for interpreting geological or atmospheric qualities of the image target.

Community
Email This Article
Comment On This Article

Share This Article With Planet Earth
del.icio.usdel.icio.us DiggDigg RedditReddit
YahooMyWebYahooMyWeb GoogleGoogle FacebookFacebook



Related Links
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


NASA's Phoenix Mars Lander Prepares For Next Sample Analysis
Tucson AZ (SPX) Jul 24, 2008
The latest activities of NASA's Phoenix Mars Lander have moved the mission closer to analyzing a sample of material, possibly icy soil, from a hard layer at the bottom of a shallow trench beside the lander.







  • UK Space Competition Unearths Young Talent
  • UCF Project Selected For NASA Explorer Mission
  • Magellan Aerospace Wins Lockheed Martin Orion Contract
  • House Passes S And T Bills Commemorating NASA's 50th Anniversary, First Woman In Space

  • NASA's Phoenix Mars Lander Prepares For Next Sample Analysis
  • Trench On Mars Ready For Next Sampling By NASA Lander
  • NASA's Phoenix Mars Lander Prepares For Next Sample Analysis
  • Phoenix Completes Longest Work Shift

  • South Korea's First Rocket Launch Might Be Put Off
  • Soyuz-ST To Be Launched From French Guiana In First Half Of 2009
  • AMC-21 Is Delivered To Spaceport
  • Sea Launch Delivers Echostar 11 To Orbit

  • GOCE Prepares For Shipment To Russia
  • NASA Works To Improve Short-Term Weather Forecasts
  • NASA's Deep Impact Films Earth As An Alien World
  • ESA To Consult The Science Community On Earth Explorer Selection

  • IAU0806: Fourth Dwarf Planet Named Makemake
  • Makemake -- or Easter bunny -- enters book of space names
  • 30 Years Since Charon Reveals Pluto To Be A Binary Planet System
  • The Great Planet Debate: Dwarf Planets Are Planets Too

  • Ancient Galactic Magnetic Fields Stronger Than Expected
  • Spitzer Reveals No Organics Zone Around Pinwheel Galaxy
  • XMM-Newton Discovery Of Nova V598 Pup
  • Brightest Star In The Galaxy Has New Competition

  • Space focus shifts back toward moon
  • ILO Instrument On Odyssey Moon's Google Lunar X PRIZE Mission
  • Online Casino Reports Bets On Lunar Gambling
  • Brown-Led Team Finds Evidence Of Water In Lunar Interior

  • Blue Ox Integrated Transportation Management System For Forestry
  • New Project To Develop GPS-Like System For Moon
  • Garmin Introduces Ruggedised Multi-Mode nuvi 500
  • AT And T Navigator Goes Global

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2007 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement